Search Details

Word: exterior (lookup in dictionary) (lookup stats)
Dates: during 1900-1909
Sort By: most recent first (reverse)


Usage:

Work has begun on the new Radcliffe Library, toward which Andrew Carnegie gave $75,000 on condition that an equal fund be raised. The exterior of the building is to correspond in appearance with the gymnasium, and is to be of about the same size. The architects are Winslow & Bigelow of Boston, and the contractor is J. E. Warren & Co. According to the contract the building will be completed on November...

Author: NO WRITER ATTRIBUTED | Title: New Radcliffe Library Started | 3/13/1907 | See Source »

...working to complete the roof before the next cold weather. Practically all the steel work is finished. On the water or south side, both the upper and lower balconies are completed and nothing remains to be done except to give the brick a final dressing after the exterior work of the entire building is finished. All the cement is laid for the terrace on the north side...

Author: NO WRITER ATTRIBUTED | Title: Weld Boathouse Progressing Rapidly | 1/4/1907 | See Source »

...extending out about twenty-nine feet and will cut off two of the windows on the east side of the reading-room. These windows and also those in the present north side of the Hall will be left glazed so as to admit light into the inner rooms. The exterior of this addition has been designed to agree architecturally with the rest of Gore Hall and yet to harmonize a little more with the older buildings in the Yard. The material used in construction will be concrete blocks, and in color and general appearance it will closely resemble the granite...

Author: NO WRITER ATTRIBUTED | Title: ADDITION TO GORE HALL | 11/1/1906 | See Source »

...photographs of the Bavarian castle of Neuschwanden, loaned by the University Library, is now on exhibition in the Periodical Room of the Union. The photographs include several exterior views and a number of views of the interior giving details of the carvings and frescoes as well as the general aspect of the rooms...

Author: NO WRITER ATTRIBUTED | Title: Photographs in Union | 1/26/1906 | See Source »

...contract called for their completion in two years, but, owing to bad weather conditions and strikes, progress has been considerably delayed. As all the buildings cannot be made ready for occupancy before about the middle of April, the School will not occupy its new quarters before next fall. The exterior, on all but the Administration Building, is completed. Work is yet to be done on the cornice of this structure, and the upper sections of two columns in front and most of the columns in the rear have not been hoisted into position. The interior work on most...

Author: NO WRITER ATTRIBUTED | Title: THE NEW MEDICAL BUILDINGS | 12/9/1905 | See Source »

| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | Next