Search Details

Word: built (lookup in dictionary) (lookup stats)
Dates: all
Sort By: most recent first (reverse)


Usage:

Sixteen month have been occupied in bringing the building to a state of completion. It is built in the style of the late Georgian period, a light-colored granite being used in the construction of the exterior. The low square windows which predominate, the extreme light and narrowness, and the massive tower which co-ordinates the two wings, all tend to lend an appearance of stern, almost forbidding severity to the structure...

Author: NO WRITER ATTRIBUTED | Title: Theological Seminary's New Building | 9/29/1911 | See Source »

...main entrance of the building leads into a long a hall built to produce the effect of an interior cloister. Turning to the right along this hall leads to the library reference room and book-stacks. These stacks are large enough to hold the combined libraries of the Andover the combined libraries of the Andover Theological Seminary and the Harvard Divinity School. They are thoroughly fireproof, and lighted in the day time by skylights. Glass flooring allow this light to reach the lower floors...

Author: NO WRITER ATTRIBUTED | Title: Theological Seminary's New Building | 9/29/1911 | See Source »

...other end of the hall from the library is a large lounging room, lighted on three sides by windows. Opening off the main hallway are four class-rooms, built to hold from eighteen to fifty men. The building is also fitted throughout with many conference rooms in which a large part of the seminar work will be done...

Author: NO WRITER ATTRIBUTED | Title: Theological Seminary's New Building | 9/29/1911 | See Source »

Graduate Manager Everard Thompson has started constructing a new gridiron on the ground opposite Yale Field which Yale has recently bought. It is supposed that a stadium will be built in this site, but this fall it will be used as an auxiliary field. Some of the practice of the regular squad may be held there. The regular gridiron on Yale Field has been returfed and graded with an eye to per-feet drainage, and there is talk of saving this field for the scheduled games and holding much of the preliminary practice on the new gridiron. Yale men believe...

Author: NO WRITER ATTRIBUTED | Title: Football at Yale | 9/28/1911 | See Source »

Work on th8e new Varsity Club house which is being built as an addition to the Union, on the Prescott street side, has progressed steadily all summer, except for a few days when the men have been hindered by lack of material. The building will not, however, be completed in time to be used for training quarters this fall as was hoped in the spring. It was said at the contractors' office yesterday afternoon that, if the work continues to advance as it is now, the roof of the building should be on in the course of four...

Author: NO WRITER ATTRIBUTED | Title: Work on the Varsity Club | 9/28/1911 | See Source »

First | Previous | 6881 | 6882 | 6883 | 6884 | 6885 | 6886 | 6887 | 6888 | 6889 | 6890 | 6891 | 6892 | 6893 | 6894 | 6895 | 6896 | 6897 | 6898 | 6899 | 6900 | 6901 | Next | Last