Search Details

Word: built (lookup in dictionary) (lookup stats)
Dates: all
Sort By: most recent first (reverse)


Usage:

...order to do away with the confusion that would necessarily arise if Gore Hall were torn down before new quarters could be built, a scheme has been proposed by which successive additions are to be made to the book-storage space, one stack after another being added to the present building, so that Gore Hall can be continued in use as the administrative portion until funds can be provided for completing the new building when the old part can be torn down to make room for the new administrative offices...

Author: NO WRITER ATTRIBUTED | Title: NEW UNIVERSITY LIBRARY | 10/13/1911 | See Source »

...large entrances and exits have been erected at Park street, Boston, and Harvard square. The one in Harvard square is especially large, as it was built to handle the exceptional crowds that attend the football games...

Author: NO WRITER ATTRIBUTED | Title: Progress on Cambridge Subway | 10/6/1911 | See Source »

...purposes of proper ventilation in the summer time the subway is built in two independent tubes instead of in a single double-tracked tube. On account of this method of construction, which is the same as that employed in the sub-aqueous tunnels near New York, the air is kept passing through the tunnels, and being constantly renewed, each train sucking after it a supply of good air and pushing out the stale...

Author: NO WRITER ATTRIBUTED | Title: Progress on Cambridge Subway | 10/6/1911 | See Source »

...line of the subway is through Brattle street to Murray street, where the "elevated trains," as the subway cars will be called, will ascend to the street. Surface cars from Newton and North Cambridge will enter the tubes at Cambridge common and Murray street respectively. Both tubes are so built that a platform two feet wide runs beside the tracks for the entire distance so that in case of accident or breakdown the passengers can walk to the nearest station without incurring any risk from electric wires...

Author: NO WRITER ATTRIBUTED | Title: Progress on Cambridge Subway | 10/6/1911 | See Source »

Work on the terminal of the Cambridge subway near Harvard square is being pushed in order that it may be completed in time for the opening of the new rapid transit line in December. The steel frames for the machine shop and for the inspection shed, built on solid concrete foundations several feet below the level of the surrounding streets, are already erected. Several tracks are also laid from the mouth of the subway leading to the yard and shops. The terminal yard lies between Boylston and Murray streets. Beside the shops there is a large storage yard...

Author: NO WRITER ATTRIBUTED | Title: Progress of Subway Terminal | 10/3/1911 | See Source »

First | Previous | 6880 | 6881 | 6882 | 6883 | 6884 | 6885 | 6886 | 6887 | 6888 | 6889 | 6890 | 6891 | 6892 | 6893 | 6894 | 6895 | 6896 | 6897 | 6898 | 6899 | 6900 | Next | Last