Search Details

Word: interior (lookup in dictionary) (lookup stats)
Dates: during 1900-1909
Sort By: most recent first (reverse)


Usage:

...owing to bad weather conditions and strikes, progress has been considerably delayed. The Power House has been providing light and heat to the buildings since November and is complete except for some minor machinery. The Animal House is finished. The four large laboratory buildings are completed outside, but the interior requires painting throughout and some other details. The Administration Building is rapidly nearing completion. Some stone-work on the cornice remains to be set in place besides a number of floors, light fixtures, and woodwork...

Author: NO WRITER ATTRIBUTED | Title: NEW MEDICAL BUILDINGS | 4/6/1906 | See Source »

...photographs of the Bavarian castle of Neuschwanden, loaned by the University Library, is now on exhibition in the Periodical Room of the Union. The photographs include several exterior views and a number of views of the interior giving details of the carvings and frescoes as well as the general aspect of the rooms...

Author: NO WRITER ATTRIBUTED | Title: Photographs in Union | 1/26/1906 | See Source »

...large lecture room for elementary courses in philosophy, and six smaller rooms. On the second floor are the psychological and sociological, libraries, the museum of social ethics, a working room for students, and a lecture room. The third floor is the psychological laboratory of 25 rooms. The interior of the building is finished in white plaster, dark pine...

Author: NO WRITER ATTRIBUTED | Title: EMERSON HALL OPENED | 1/3/1906 | See Source »

...before next fall. The exterior, on all but the Administration Building, is completed. Work is yet to be done on the cornice of this structure, and the upper sections of two columns in front and most of the columns in the rear have not been hoisted into position. The interior work on most of the buildings has passed the preliminary stage but owing to the strike of the masons all plastering work has practically come to a standstill...

Author: NO WRITER ATTRIBUTED | Title: THE NEW MEDICAL BUILDINGS | 12/9/1905 | See Source »

Work on the exterior of Emerson Hall is now entirely completed, and only a bust of Emerson by F. Duveneck, of Indianapolis, remains to be placed in the main entrance. In the interior the plaster, iron stairways and rough wood-work have already been put in, and the flooring of dark pine is being laid. The furniture, most of which is to be of oak, has not yet arrived. The heating plant, to connect with the boiler in Sever, is being installed. It is expected that the building will be ready for inspection by the middle of December...

Author: NO WRITER ATTRIBUTED | Title: Emerson Hall Practically Completed | 11/1/1905 | See Source »

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | Next