Search Details

Word: steeling (lookup in dictionary) (lookup stats)
Dates: all
Sort By: most recent first (reverse)


Usage:

This new construction will be of steel and will form a single U-shape baseball stand in place of the three sections as they are now. The work will be completed in time for the first Princeton game on June...

Author: NO WRITER ATTRIBUTED | Title: NEW BLEACHERS FOR UNIVERSITY DIAMOND | 4/12/1915 | See Source »

...feet steel radio towers are being erected on the roof at each end of the new Cruft Memorial Laboratory as the final step in the installation of the University's first wireless station, according to the changed arrangement with the Massachusetts Institute of Technology, according to which the high tension work is to be done there and the wireless experiments are to be carried on at the University...

Author: NO WRITER ATTRIBUTED | Title: WIRELESS PLANT INSTALLED | 3/26/1915 | See Source »

...racks which hold the sixty miles of shelves are all in place. Both are of pressed steel, covered with a dark grey enamel. There are sixteen floors of these cases, capable of holding 2,500,000 volumes. Work on them has ceased, and the shelves will be in place by the first of April. These main book cases are extremely open. They extend only seven and a half feet from the floor, so that every volume may be reached without a stand. Means for transporting the books to and from the shelves, and a numbering system, have been carefully arranged...

Author: NO WRITER ATTRIBUTED | Title: LIBRARY NEARING COMPLETION | 3/13/1915 | See Source »

...central room as completed has been raised from two to three stories and has been equipped with steel cases for containing specimens and tables for observation. This addition was made possible by the gift of five members of the visiting committee...

Author: NO WRITER ATTRIBUTED | Title: GRAY HERBARIUM FINISHED | 3/10/1915 | See Source »

...long process of rebuilding the Gray Herbarium has been finished by the completion of the central room within the last few days. The original frame structure, erected in 1864 to house Dr. Gray's collection, has been entirely rebuilt in steel and concrete, so that it is now the best equipped and best building adapted for its purpose in the world...

Author: NO WRITER ATTRIBUTED | Title: GRAY HERBARIUM FINISHED | 3/10/1915 | See Source »

First | Previous | 4133 | 4134 | 4135 | 4136 | 4137 | 4138 | 4139 | 4140 | 4141 | 4142 | 4143 | 4144 | 4145 | 4146 | 4147 | 4148 | 4149 | 4150 | 4151 | 4152 | 4153 | Next | Last