Search Details

Word: interior (lookup in dictionary) (lookup stats)
Dates: all
Sort By: most recent first (reverse)


Usage:

...quarters for the CRIMSON on Plympton street will be ready for occupancy with the opening of College in the fall. Even if the interior work on the front portion of the building is not completed, the presses in the rear will be set up and ready for use. The equipment of the Crimson Printing Company will be transferred from the Union during the summer and the company will continue its present relations with the CRIMSON, renting its space in the new building from the CRIMSON, and printing the newspaper under contract...

Author: NO WRITER ATTRIBUTED | Title: MARKED PROGRESS IN BUILDING | 6/22/1915 | See Source »

...first two nights will be "The Waves of Torre," a one-act piece by Miss Ethel Claire Randall, telling of an Irish fisherman's dread of the sea, the terror being lost, however, when he is called to the aid of a wrecked ship. The scene is the interior of Bhride Senanes cottage on the Island of Torre off the northwest coast of Donegal, Ireland...

Author: NO WRITER ATTRIBUTED | Title: 47 WORKSHOP TO PRESENT "THE WAVES OF TORRE" | 5/20/1915 | See Source »

Work on the Harry Elkins Widener Memorial Library has been progressing rapidly during the last month, and the building is now in its final stage. All constructive work has ceased; there only remains to remove the scaffolding and complete the interior decorating. By June first everything will be ready for the books...

Author: NO WRITER ATTRIBUTED | Title: LIBRARY NEARING COMPLETION | 3/13/1915 | See Source »

...trouble has been spared to make the interior of the building as handsome and convenient as possible. The illumination throughout has been carefully planned. High windows and the two lightwells coupled with open interior construction, assure a free, well-lighted interior. The front inside steps and first floor columns are of magnificent white stone...

Author: NO WRITER ATTRIBUTED | Title: LIBRARY NEARING COMPLETION | 3/13/1915 | See Source »

...library, all the structural concrete has been poured, and the construction work is now up to the roof. This structural concrete is the skeleton of the buildings. It is poured in a semi-liquid state into wooden forms, and is reinforced by steel rods. The foundation walls, piers, interior columns and floors are all made of this material. Up to the present 27,000 cubic yards of concrete and 2,600 tons of steel reinforcing have been used. Including the library buildings, the 27,000 cubic yards is 73 per cent. of the whole amount of concrete which will...

Author: NO WRITER ATTRIBUTED | Title: AT WORK ON TECH BUILDINGS | 2/2/1915 | See Source »

First | Previous | 1824 | 1825 | 1826 | 1827 | 1828 | 1829 | 1830 | 1831 | 1832 | 1833 | 1834 | 1835 | 1836 | 1837 | 1838 | 1839 | 1840 | 1841 | 1842 | 1843 | 1844 | Next | Last