Search Details

Word: interior (lookup in dictionary) (lookup stats)
Dates: during 1900-1909
Sort By: most recent first (reverse)


Usage:

...Harvard Club of New York City are remodelling the interior of their club-house at 27 West 44th street and are building a six story addition which will more than treble the size of their former quarters. The entire building when completed will occupy a lot 200 feet deep by 50 feet broad extending through to 45th street...

Author: NO WRITER ATTRIBUTED | Title: New York Harvard Club Changes. | 2/7/1905 | See Source »

...contagious ward of the Stillman Infirmary, which was provided for last year by a gift of $75,000 from Mr. James Stillman, is now completed. Some of the interior furnishings have already been installed, and the building will be ready for occupancy by March 1. This annex will enable the Infirmary to care for all cases of illness in the University and will obviate the necessity of sending infectious cases to the Cambidge City Hospital...

Author: NO WRITER ATTRIBUTED | Title: Contagious Ward Completed. | 2/3/1905 | See Source »

Work on the building for the Departments of Pharmacology and Hygiene is almost completed. The interior finishing, however, will not be done until spring, as the walls are not now sufficiently dry. The building next nearest to completion is that for the Departments of Bacteriology and Pathology, in which all the partitions are built and the plumbing and heating systems are installed. In the building for the Physiology and Physiological Chemistry Departments, the concrete floors are all set, and the plumbing and ventilating pipes are being set up. The building for Anatomy and Histology is about equally far along...

Author: NO WRITER ATTRIBUTED | Title: Work on Medical School Buildings. | 1/7/1905 | See Source »

Each building is composed of two wings joined by an amphitheatre and is equipped with interior partitions so arranged that they can be moved without weakening the structure, thus making it possible to vary the size of the different rooms...

Author: NO WRITER ATTRIBUTED | Title: Work on Medical School Buildings. | 1/7/1905 | See Source »

...exterior of the building is entirely completed except the finishing of the sunface of the marble trimmings. In the interior, plastering is now being done and preparations for work on the wood finish are being made. The heating and ventilating apparatus is in process of installation...

Author: NO WRITER ATTRIBUTED | Title: Elizabeth Agassiz House. | 11/26/1904 | See Source »

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | Next