Search Details

Word: dammed (lookup in dictionary) (lookup stats)
Dates: all
Sort By: most recent first (reverse)


Usage:

...Committee appointed by the legislature to consider the advisability of constructing a dam across the Charles River between Boston and Cambridge filed its report with the clerk of the General Court yesterday afternoon. The committee consisted of Mr. R. H. Dana '74, Mr. H. S. Pritchett, president of the Massachusetts Institute of Technology, and Col. S. M. Mansfield, of the United States Engineering Corps. The committee recommends that a dam be built near the present site of the Craigie bridge and that a fresh-water basin be maintained at a permanent level. The report is most thorough and exhaustive...

Author: NO WRITER ATTRIBUTED | Title: CHARLES RIVER DAM REPORT | 1/15/1903 | See Source »

These objections were all refuted by the evidence of the experts employed by the committee. The sanitary question was the hardest accurately to determine, but from a long series of experiments it was conclusively proved that the proposed dam would materially better the existing conditions...

Author: NO WRITER ATTRIBUTED | Title: CHARLES RIVER DAM REPORT | 1/15/1903 | See Source »

...committee recommends the construction of a dam, one hundred and thirty feet in width, to serve also as a bridge. Provision is made for a large lock and proper sluicing appliances. The estimated cost of such a structure is $1,250,000 or substantially the same as the cost of a bridge, which must, if the dam is not constructed, be built at this point...

Author: NO WRITER ATTRIBUTED | Title: CHARLES RIVER DAM REPORT | 1/15/1903 | See Source »

...Blake will deliver a lecture on "The Charles River Dam and Some of its Problems," under the auspices of the Engineering Society in the Lecture Room of Pierce Hall at 8 o'clock this evening. Mr. Blake is a civil engineer, and has designed one of the plans which have been under consideration by the Dam Commission appointed by Governor Crane to present a report to the Legislature on the advisability of such a structure...

Author: NO WRITER ATTRIBUTED | Title: Lecture on the Dam. | 1/13/1903 | See Source »

...Charles River Dam Commission has received the reports of all the experts and engineers who have been employed in the preliminary investigations for construction of the dam. The committee is now preparing the report which is to be finished if possible by January 14, the time specified by the legislature...

Author: NO WRITER ATTRIBUTED | Title: Charles River Dam Report. | 1/7/1903 | See Source »

First | Previous | 543 | 544 | 545 | 546 | 547 | 548 | 549 | 550 | 551 | 552 | 553 | 554 | 555 | 556 | 557 | 558 | 559 | 560 | 561 | 562 | 563 | Next | Last