Search Details

Word: corridors (lookup in dictionary) (lookup stats)
Dates: during 1910-1919
Sort By: most recent first (reverse)


Usage:

...upon the changes on the ground floor where the large lecture hall has been split up by a semi-circular wall into a smaller lecture room capable of holding about 205 people, with a raised platform at the back suitable for the exhibition of large casts; and a semicircular corridor outside the lecture room, for the exhibition of other casts. This adds materially to the exhibition space in the Museum, and makes it possible to separate the casts and the original works of art. These are the principal improvements, though other minor ones have been effected...

Author: NO WRITER ATTRIBUTED | Title: REPORT ON FOGG ART MUSEUM | 3/13/1913 | See Source »

...contract, such as interior wood finish, wall decorations, diffusing sash (which will be used in the vestibule, the first story of the main hall, the Widener Room, Memorial Hall, and the hall in front of the main reading-room). The marble work will also be a special contract. The corridor floor of the second story, the stairs, toilet rooms, and the walls and ceiling of the small side vestibule are to be of Rutland or other approved clear white marble, while all other marble work will be of light pink Tennessee marble. The granite work calls for risers and flat...

Author: NO WRITER ATTRIBUTED | Title: CONTRACT FOR NEW LIBRARY | 12/9/1912 | See Source »

...found that the acoustics of the large lecture room in the Fogg Museum were poor, and in order to remedy them a portion of the room will be separated by a wall. The area thus cut off from the lecture hall will form a semi-circular corridor, in which it is planned to hang the casts which are now in the main hall of the museum. By this means the original Grecian pieces, which are to remain where they are in the front hall, will be separated from the casts of the original statuary...

Author: NO WRITER ATTRIBUTED | Title: CHANGES IN FOGG MUSEUM | 9/24/1912 | See Source »

...work on the Wolcott Gibbs Memorial Laboratory, the first of the six proposed new chemical laboratories, is progressing rapidly. The superstructure is complete as far as the second story and the forms for the concrete floor are already in place. The white tilling in the corridor and laboratories of the first floor will be put in place this month. At the present rate of construction the building will be ready for occupancy on September...

Author: NO WRITER ATTRIBUTED | Title: RAPID WORK ON LABORATORY | 6/4/1912 | See Source »

...first floor, built of concrete, contains a ward for ten beds, and a large dining room. A corridor, running the length of the building, opens into a two-storied sun-room at the extreme left. To the right of the entrance are the matron's room, the offices, the laboratory, an operating room, and a room for the surgeons. The second floor follows the plan of the first, with a large ward and a number of separate rooms; and the nurses' quarters are on this floor...

Author: NO WRITER ATTRIBUTED | Title: MEMORIAL HOSPITAL TO OPEN | 3/26/1912 | See Source »

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | Next