Word: built
(lookup in dictionary)
(lookup stats)
Dates: all
Sort By: most recent first
(reverse)
...days, work will be started on a new dormitory on Mt. Auburn street, next to Claverly Hall. The building will be a seven-story structure of brick and limestone, and will be built and owned by Isaac McLean. It will be equipped with an elevator, a house telephone system, both gas and electric light, and steam heat. It will also have squash courts. There will be seven double suites, one on each floor, and thirty-four single suites. In addition to a bath, each suite will have its own shower. The dormitory will be called Ridgely Hall, and will...
...become so extravagantly shaped by outside influences--the newspapers and the public who have sat astride of us and spurred us into an absurd athletic gallop--and we should be suspicious of any tendency to emphasize the spectacular side of Class Day, or Commencement. Both these institutions have been built up for many years by the customs and traditions of many classes, and changing them because we have been presented with a fine amphitheatre is akin to coasting in June because someone has given us a toboggan. In spite of the fact that Sanders is limited in capacity and that...
...artesian well beside Memorial Hall, which has been under construction since June, is now nearly finished, and will be ready for use as soon as the electric pump now being built is installed. The well is 321 feet deep with an eight inch pipe and will supply water at the rate of 50 gallons a minute. When completed, the whole structure and machinery of the well will be entirely underground...
...Brigham Hospital is the largest of the proposed institutions to be affiliated with the new Harvard Medical School. It has been planned by the trustees to erect an elaborate set of buildings on a section of the large lot of land upon which the Medical School is being built. The desired plot has a frontage of 945 feet on Huntington avenue and an option upon it has been secured from the Corporation...
Regular winter work for all candidates for the track team will begin directly after the recess, on Monday, January 4. The training will be under the direction of Mr. Graham and will consist of gymnasium work, practicing starts, and outdoor running on the new board track which is being built on Holmes Field. This work is intended to prepare not only the men intending to enter the spring meets, but also those who will enter the B. A. A. indoor meet on February...