Word: alongable
(lookup in dictionary)
(lookup stats)
Dates: all
Sort By: most recent first
(reverse)
...have been given to encourage and perpetuate the secondary fall rowing, whether it consists of inter-dormitory bumping races or some other form of rowing competition. The success of the bumping races this fall, however, was so pronounced that the rowing authorities will strive to encourage the fall rowing along these lines rather than in various other ways which have been used in former years. One of the cups is a perpetual challenge cup, to be competed for each year; the other will become the permanent property of Claverly...
...through. Coach Reid was not on the field, as he has gone to Springfield to consult with the Yale coaches about officials for the Yale game next Saturday. Captain Foster, who has now nearly recovered from his sprained ankle, was again in the signal practice, in which he got along well. Orr's foot is troubling him slightly, but he will be out this afternoon together with Burr, who has had a slight cold. Kersburg wrenched his knee in the Dartmouth game, but is rapidly recovering and will be all right by Saturday. Starr played end in the signal practice...
...addition will run along the north side of the library, extending out about twenty-nine feet and will cut off two of the windows on the east side of the reading-room. These windows and also those in the present north side of the Hall will be left glazed so as to admit light into the inner rooms. The exterior of this addition has been designed to agree architecturally with the rest of Gore Hall and yet to harmonize a little more with the older buildings in the Yard. The material used in construction will be concrete blocks...
...taking has recently been filed and work begun on the Boston embankment, extending from the Cambridge bridge along the Boston shore as far as the southerly side of the Back Bay fens. Construction work on section one of the embankment comprises 2700 linear feet of retaining wall and about the same length of earth embankment. The Commission will soon receive bids for the work on section two, which is located back of Beacon street. Along the wall, south of the Cambridge bridge, the esplanade will vary in width from 180 to 300 feet, and the portion in the rear...
This embankment, with the land already purchased by the Metropolitan Park Commission and the City of Cambridge, will form a continuous park system along the 17 1-2 miles of shore-line from Charlesbank Park to the dam at Watertown...